Grab / ride-hailing
Most direct- Travel time
- 40–55 min
- Estimated fare
- RM 65–90
- Highway tolls
- + RM 6–9
- Set drop-off to
- Monash Gate A
- KLIA T1: Level 1, Door 3 or 4
- KLIA T2: Level 1, Transportation Hub
Everything you need for the week: the day-by-day programme, which room you're in, and how to get to Monash University Malaysia from the airport or by car.
In partnership with SPARKLE (Strengthening Preparedness in the Asia Pacific Region through Knowledge, Learning and Engagement) and the Peter Doherty Institute for Infection and Immunity.
Every session, Monday to Friday, is in Room 9501: Building 9, Level 5, Room 1. All times are Malaysia time (MYT).
Jalan Lagoon Selatan, Bandar Sunway, 47500 Subang Jaya, Selangor Darul Ehsan, Malaysia.
Present your identification at Gate A security. The BRT station and car park connect straight to Gate A by a covered Level 3 bridge.
Building 9 · Level 5 · Room 1. All five days, 21–25 September. From Gate A, head to Building 9 and go up to Level 5.
Two ways in. Grab is quickest door to door; rail plus BRT avoids the highway rush (07:30–09:30 and evenings).
Board at the airport's basement transit terminal. Direct to KL Sentral.
~30–35 minAt KL Sentral, board towards Putra Heights. Alight at USJ 7 (KJ31).
~35 minWalk across the upper-level bridge at USJ 7 to the BRT platform. Board towards Sunway-Setia Jaya.
Exit onto the Level 3 covered bridge, which leads directly to the Gate A security entrance.
Take a Grab straight to Gate A. The rail route involves two interchanges and bridge walks.
Highway traffic peaks 07:30–09:30. Rail + BRT keeps your journey time predictable.
Navigate to Monash University Malaysia. The campus is reached via the Damansara–Puchong Expressway (LDP), KESAS, New Pantai Expressway (NPE) or Federal Highway; follow signs for Sunway City / Sunway Lagoon.
Any available level inside the BRT Park & Ride structure.
Take the lift or stairs up to Level 3.
Covered, weather-protected pedestrian bridge.
Follow signs to the Gate A security check.
Listed in order of first appearance in the programme.
Most sessions are hands-on modelling in R.
Shown at Gate A security on entry.
For the BRT, LRT and car park. Keep at least RM 10 loaded.
The one from your application. The sessions give you tools to work on it.